About 6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck
The SINOTRUK Oil tanker truck uses a 400HP engine and a 12-speed gearbox. This configuration fully meets the transportation needs of the truck. The chassis-guided wheel disc brake ensures braking performance. The application of three bow plates not only reduces the dead weight but also improves driving comfort; the application of rear axle airbag suspension effectively filters the bumps on the ground and improves the efficiency of transporting oil liquid level in the tank.
6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck Specification
Product Name: 6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck For Zambia
Application: Constructions work
Engine: WP12.400E201, 400HP, EURO II
Cabin: With one bed, A/C
Gearbox: 12 forward and 2 reverse gear
Tire: 12.00R20, 10+1 pcs
Fuel Tank: 400L
Tanker Body: 20000 Liters
Dimension: 9950x2500x3350mm
6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck only for your reference, we can manufacture other Oil Tanker Truck basic your request.
6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck Detail Design
The anti-drilling beam design installed on the lower side of the front face of the 6x4 HOWO tanker truck improves safety, and the aluminum alloy guardrail protects the fuel tank and urea tank. The oil loading and unloading valve is placed in a high-strength aluminum alloy box both cleans and protect. A fire extinguisher is placed on each side of the rear of the vehicle for easy access.The air bag suspension has obvious vibration filtering effect and meets the strict requirements for oil transportation.
6x4 SINOTRUK HOWO 20000 Liters Oil Tanker Truck Routine Maintenance
To ensure the cleanliness of the HOWO 20000 Liters oil tanker, the oil tank and oil delivery system should be cleaned regularly. The internal and external joints at both ends of the oil delivery hose should be regularly coated with lubricating oil to make it easy and convenient to disassemble and assemble the oil tanker. After each work on the oil pipe is completed, clean it in time to ensure that the inside of the pipe is clean. Before refueling operations, a lightning rod must be inserted into the wet ground. The ground tape of the tank truck should be grounded. Good static conductivity should always be maintained during the operation.